各种不锈钢瓶和竹制不倒翁批发的一站式解决方案服务提供商
The production process will be 12 stages.
1. Raw material preparing, the long 316/304/201 stainless steel tube, we need cutting specified length per the capacity of the bottle
2. Water Swelling, making the outside wall of the bottle
3. Cutting, one mould for two pieces, usually the water swelling mould for two bottles
4. Making the bottle bottom
5. Inspection and testing the bottle bottom and bottle body
6. Flatting the mouth of the vacuum bottle
版权所有 © 2019 金华福弗易记小商品有限公司 |保留所有权利
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.